Woodley had fewer than a thousand people a century ago. It grew around an aerodrome, then built houses on top of it, and the result is a town with three or four distinct electrical vintages.
Assessed against the national standard and authorised to self-certify our own electrical work under Part P. Add registration no.
Fully insured
Public liability cover in place on every job, domestic and commercial. Add cover amount
BS 7671 18th Edition
Every installation designed, installed and tested to the current wiring regulations.
Woodley, Berkshire
The houses we work on in Woodley.
Woodley Aerodrome opened in 1929 on a hundred acres of farmland, and around six thousand aircraft were built and flown from here between 1933 and 1962. Flying stopped in the early 1960s, and after gravel extraction the airfield itself was redeveloped for housing and light industry by Adwest Properties during the 1980s. That matters to us because it is a single, datable tranche of housing, now around forty years old, wired after RCDs arrived in 1981 but long before they were required on every socket circuit. Those boards are the most common job we see in Woodley. The older tier is the post-war estate building of the 1950s and 60s, before the town centre was rebuilt in the 1960s and before Woodley gained town status in 1974 with around 29,000 residents. That stock sits either side of the 1966 earthing change and the switch to PVC cable around 1970, so it is where genuine rewires still come up. At the newest end, the Bulmershe Court college site was converted in 2013 and 2014 into houses, flats and a care home — 17th Edition era, and generally sound, so the work there is additional circuits and lighting rather than anything structural. Woodley Green is a designated conservation area, though the borough has not published an appraisal for it.
Older properties with rubber or fabric-insulated cable, undersized circuits or a board that keeps tripping. We plan the circuits accordingly and cover everything from first fix through to second fix, testing and certification.
Replacing older units that have no RCD protection with an 18th Edition metal-clad consumer unit, RCBO protection on every circuit, and full earthing and bonding brought up to standard. Most are done inside a day.
Bespoke lighting solutions to suit any room, shape or size, designed around what you actually want from the space. From hanging a simple ceiling rose to bespoke LED strip lighting with smart switching.
First and second fix covered in collaboration with all other trades, ensuring a smooth process from start to finish and an exceptional installation throughout.
We self-certify all of our own work, from minor works right through to full Electrical Installation Certificates on fuse board upgrades and new installations.
Something tripping and nobody can explain why? We'll trace it and tell you what it actually is. Speak to our electrician about our current hourly rate for fault finds.
Lighting a garden properly, and getting a real supply out to a shed, garden office or outbuilding. Buried armoured cable, its own protection at the board, and certification on completion.
Questions
Working in Woodley.
Do you cover Woodley?
Yes. Woodley is part of our regular working area, along with Earley, Sonning, Charvil, Twyford and the surrounding villages. Call 07482 209800 and we'll arrange a free survey.
How quickly can you get to Woodley?
We reply to enquiries the same day, most days within the hour, and we'll give you a firm survey date on that call rather than a vague window.
Do you charge for a quote in Woodley?
No. Quotes are free and there's no obligation. We survey the job, write the price down and leave it with you — no same-day discounts, no pressure on the doorstep.
Are you registered and insured?
Protec Elec Ltd is NAPIT registered, which means we're assessed against the national standard and authorised to self-certify our own work under Part P. We carry public liability cover on every job.
How to tell whether your house needs rewiring or just a new consumer unit, what the age of your property tells you, and when to get it properly tested.